Gas Pipeline Southern Interconnection
Sector: Power Generation (CCGT) • Location: Bosniak-Croat Federation, Bosnia and Herzegovina
Source: Daily Sabah
A $1.5 billion energy project in Bosnia-Herzegovina led by investors close to U.S. President Donald Trump. The project includes a gas pipeline to bring U.S. natural gas from a liquefied natural gas terminal in Croatia to Bosnia, as well as thermal power plants to replace coal-based electricity production. It also involves modernization of airports in Sarajevo and Mostar.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Geothermal, Natural Gas
- Location
- Bosniak-Croat Federation, Bosnia and Herzegovina
- Updated
- 22 Jul 2026
- Source
- Daily Sabah
ConstructChat
Ask ConstructChat about Gas Pipeline Southern Interconnection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $1.5 billion energy project in Bosnia-Herzegovina led by investors close to U.S. President Donald Trump. The project includes a gas pipeline to bring U.S. natural gas from a liquefied natural gas terminal in Croatia to Bosnia, as well as thermal power plants to replace coal-based electricity production. It also involves modernization of airports in Sarajevo and Mostar. |
Original sector | Energy |
Budget |
Location
Country | Bosnia and Herzegovina |
State | Bosniak-Croat Federation |
Source
Source | Daily Sabah |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Natural Gas |
Article published date | 2026-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
