logo
ProjectClosed

GAS TRANSMISSION

One of 10,000+ projects Taiyo tracks in Thailand.

Source: World Bank Group

The objective of the Bongkot Gas Transmission Project is to increase the gas supply capabilities of Thailand by: (a) expanding the gas transmission system; (b) strengthening the institutional functioning of the Petroleum Authority of Thailand (PTT); and (c) making more efficient use of capital resources in the gas sector through annual review of PTT's investment program. The project consists of t

Status
Closed
Sector
Oil and Gas, Natural Gas, Telecommunications, Commercial, Government
Location
Thailand
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about GAS TRANSMISSION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “GAS TRANSMISSION” is an infrastructure initiative in the Oil and Gas sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Bongkot Gas Transmission Project is to increase the gas supply capabilities of Thailand by: (a) expanding the gas transmission system; (b) strengthening the institutional functioning of the Petroleum Authority of Thailand (PTT); and (c) making more efficient use of capital resources in the gas sector through annual review of PTT's investment program. The project consists of the following components: (1) a long submarine pipeline from the Bongkot gas field to the existing Erawan production complex; (2) a long submarine pipeline from Erawan to a terminal at Khanom; (3) a new Supervisory Control and Data Acquisition and telecom system and renovation of the existing system; (4) a riser platform; (5) equipment including additional compression capacity; (6) upgrading of PTT's Management Information System and training of staff; and (7) a study for preparation of safety and environmental standards, and a study for the second pipeline.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Thailand

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Oil and Gas, Natural Gas, Telecommunications, Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project