logo
ProjectActive

Gaselia Group

Active · Mali

Source: International Finance Corporation (IFC)

The proposed investment is in the form of an €11 million corporate A loan from IFC, and an €11 million parallel senior loan from Proparco to support the expansion in Côte d’Ivoire, Guinea, Senegal, and Mali of Gaselia Industries Group (Gaselia or the Sponsor), an existing IFC client (project # 29470) and one of the largest beverage and packaging groups in West Africa (the Project). Gaselia operate

Status
Prospective
Sector
Waste Processing and Treatment, Biomass, Water Supply and Storage, Consumer Products, Government, Manufacturing (Industrial), Commercial
Location
Mali
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Gaselia Group

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Gaselia Group” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Mali. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed investment is in the form of an €11 million corporate A loan from IFC, and an €11 million parallel senior loan from Proparco to support the expansion in Côte d’Ivoire, Guinea, Senegal, and Mali of Gaselia Industries Group (Gaselia or the Sponsor), an existing IFC client (project # 29470) and one of the largest beverage and packaging groups in West Africa (the Project). Gaselia operates 4 plants in Mali, Cote d’Ivoire and Senegal and produces carbonated soft drinks (CSD), mineral water, preforms and caps for plastic bottles and carbon dioxide for beverages. The Sponsor is currently building a greenfield CSD plant in Guinea in an industrial zone near Conakry, the capital city. The 5 ha new Guinean project site will be constructed through an engineering, procurement, and construction (EPC) contract engaging a workforce of approximately 100 workers. During operation the plant will employ 75-100 workers. There are communities living in the vicinity of the site. Expansion activities will include additional equipment to increase production in all countries.

Original sector

F-BA - Soft Drink

Location

Country

Mali

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Biomass, Water Supply and Storage, Consumer Products, Government, Manufacturing (Industrial), Commercial

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project