Gate (Gas Access to Europe) Liquefied Natural Gas (LNG) terminal is located in Maasvlakte in Rotterdam, the Netherlands. The terminal was completed in June 2011 and officially inaugurated in September 2011. It has an initial annual capacity of 12 billion cubic metres (bcm) and a maximum capacity of 16bcm/y. The terminal was developed by Nederlandse Gasunie (Gasunie) and Koninklijke Vopak (Royal Vo

Project Information FAQ

Project Information

3 Q
The project “Gate LNG Terminal” is an infrastructure initiative in the Cement sector, located in Netherlands. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Gate (Gas Access to Europe) Liquefied Natural Gas (LNG) terminal is located in Maasvlakte in Rotterdam, the Netherlands. The terminal was completed in June 2011 and officially inaugurated in September 2011. It has an initial annual capacity of 12 billion cubic metres (bcm) and a maximum capacity of 16bcm/y. The terminal was developed by Nederlandse Gasunie (Gasunie) and Koninklijke Vopak (Royal Vopak). It is spread over an area of 35ha. Estimated investment in the facility was €800m. The project was funded by the European Investment Bank and a syndicate of ten private banks. Major functions of the terminal include receipt, storage, regasification and distribution. The first commercial cargo, carried by Bu Samra vessel, arrived at the terminal in September 2011. Three carriers, including the Q-Max vessel Al Samriya, had previously delivered LNG to the terminal between June and July 2011. The feasibility study for the terminal was started in August 2005 and the environmental permit was awarded in November 2006. Construction of the terminal commenced in June 2008. The terminal includes four storage tanks with a capacity of 180,000m3 each. The tanks have a diameter of 86m and are about 46m high. They are made of a metal inner tank and a concrete outer tank. A layer of insulation between the two tanks keeps the temperature at -160 °C. All connections to the tank are made from the roof to ensure there is no leakage in case of a calamity. Two LNG jetties capable of handling Qmax Vessels are also part of the terminal. The jetties will be able to handle larger carriers in the future. The LNG carriers are berthed at the terminal in a separate canal, called the Kleine beer-canal, which is inaccessible to heavier and larger vessels. LNG carriers with deep draught are grounded and guided through pilots and tugs. The terminal is protected from waves by the Northern Breakwater. Liquefied gas from the vessels is sent to the storage tanks through an unloading installation and a pipeline. Pressure in the tanks is regulated through a closed vapour return system. The terminal includes a regasification area where the LNG is vapourised and the natural gas is supplied through the existing Dutch gas transmission network. The terminal is a closed system, hence no gas is released into the atmosphere during normal operations. Rotterdam was chosen as the location for the terminal due to the deep and wide access of the Port of Rotterdam. The location also provides access to the European market where demand for LNG is increasing. The terminal helps in increasing the security of supply in the region. It fulfils the rising demand for LNG and also addresses the problem of declining gas production in the region. The terminal establishes the Netherlands as a major hub for LNG imports and distribution and serves as an open distribution centre for European energy suppliers. About 180 LNG vessels are expected to be handled by the terminal annually. To reach the maximum capacity of 16bcm/y, the terminal is planned to be expanded in the future. The expansion plans include the construction of a fourth LNG tank. It will enable the terminal to handle 200 LNG carriers a year. The terminal is currently being used by five companies including Dong Energy, EconGas OMV International, RWE Supply & Trading, Eneco and E.ON Ruhrgas. A consortium of Techint Group, Sener Ingeniería y Sistemas, Entrepose and Vinci Construction Grands Projets was appointed as the Engineering, Procurement and Construction (EPC) contractor for the project. Svašek Hydraulics carried out wave modelling, metocean study, cold water discharge modelling and other studies for the project. Sociedade de Montagens Metalomecânicas carried out prefabrication and erection of cryogenic piping and supports, including installation of in-line equipment. DNV carried out risk assessment of the terminal and LNG tanker transport.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data