GATEWAY CONNECTIVITY IN MADISON
Construction work program · Georgia
Source: Georgia Department of Transportation (GDOT)
A multi-trail proposing approximately 2,500 linear feet of sidewalk and pedestrian crosswalks to create and improve connectivity in the City of Madison on West Jefferson Street, 5th Street, Town Walk Circle, and Wellington Park. The existing trail on Wellington Park will be demolished and reconstructed to comply with ADA. Utility relocation and Right-of-Way (ROW) Acquisition are not anticipated fo
- Status
- Under Construction
- Sector
- Car parking, Power Transmission, Rail, Residential, Road, Government, Automotive, Power Generation (CCGT)
- Location
- Madison, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about GATEWAY CONNECTIVITY IN MADISON
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A multi-trail proposing approximately 2,500 linear feet of sidewalk and pedestrian crosswalks to create and improve connectivity in the City of Madison on West Jefferson Street, 5th Street, Town Walk Circle, and Wellington Park. The existing trail on Wellington Park will be demolished and reconstructed to comply with ADA. Utility relocation and Right-of-Way (ROW) Acquisition are not anticipated for the project. Railroad coordination will be required. There is a cemetery located close to the project area and there appears to be a historic home in the area. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Madison |
Source
Source reliability | High |
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Rail, Residential, Road, Government, Automotive, Power Generation (CCGT) |
Article published date | 2024-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
