Gateway Grid Battery Energy Storage System (100MW-400MW)
Sector: Steel • Location: Cloverdale, Virginia, United States of America
Source: Dodge USA
100MW / 400MWh - New electric substation - 144 above ground enclosures - Steel unit about 8-feet-wide, 8- to 9-feet-tall, and 30-feet-long - Site is 49.9 acres in size - 14 acres will be developed for the BESS and the ancillary project substation
- Status
- Prospective
- Sector
- Steel, Energy Storage, Power Generation (CCGT), Consumer Products, Metal, Commercial, Raw Materials
- Location
- Cloverdale, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Gateway Grid Battery Energy Storage System (100MW-400MW)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 100MW / 400MWh - New electric substation - 144 above ground enclosures - Steel unit about 8-feet-wide, 8- to 9-feet-tall, and 30-feet-long - Site is 49.9 acres in size - 14 acres will be developed for the BESS and the ancillary project substation |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Cloverdale |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Energy Storage, Power Generation (CCGT), Consumer Products, Metal, Commercial, Raw Materials |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
