Gateway Monument Signs Ph 1 REBID
Sector: Consumer Products • Location: Bryan, Texas, United States of America
Source: Dodge USA
The City anticipates the scope of work for the Project to consist of the following responsibilities and the following items: Coordinate all construction activities per TXDOT requirements to ensure a safe construction site. Construct gateway monument sign at Highway 6 location Construct gateway monument sign at Highway 21 location Install all necessary electrical conduit and wiring to power the lig
- Status
- Closed
- Sector
- Consumer Products, Power Generation (CCGT), Road, Mass Transit, Government, Rail, Commercial
- Location
- Bryan, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Gateway Monument Signs Ph 1 REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City anticipates the scope of work for the Project to consist of the following responsibilities and the following items: Coordinate all construction activities per TXDOT requirements to ensure a safe construction site. Construct gateway monument sign at Highway 6 location Construct gateway monument sign at Highway 21 location Install all necessary electrical conduit and wiring to power the lighted signs Clean up site and coordinate with Owner to establish vegetation on all disturbed areas... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Bryan |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Power Generation (CCGT), Road, Mass Transit, Government, Rail, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- CS 611/SURSSON STREET FROM SR 4 TO OLD BEN CARTER ROAD - TIA
- EAST TOLLISION STREET
- NORMAN BERRY DR/BOBBY BROWN FROM SUMNER PARK TO VIRGINIA AVE
- NEW DETACHED ADU, 840 SQ.FT. AND NEW PORCH, 32 SQ.FT.
- NEW DETACHED ADU 799 SQ. FT. - 3 BED 2 BATH
- BLDG 3, UNIT 4, NEW TOWNHOME WITH GARAGE 1605 SQ FT LIVING, 482 SQ FT GARAGE
- The Kia Forum
- William R. Boone High School
