logo
ProjectClosed

Gateway: Tonnelle Ave Overhead Bridge & Utility Relocation

Closed · New Jersey · Last reported Jul 2024

Source: Dodge USA

Relocation of utilities and construction of a new roadway bridge above a new future railroad right-of-way

Status
Closed
Sector
Rail, Water Supply and Storage, Waste Processing and Treatment, Bridge, Power Transmission, Road, Commercial, Power Generation (CCGT)
Location
North Bergen, New Jersey, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Gateway: Tonnelle Ave Overhead Bridge & Utility Relocation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Gateway: Tonnelle Ave Overhead Bridge & Utility Relocation” is an infrastructure initiative in the Rail sector, located in North Bergen, New Jersey, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Relocation of utilities and construction of a new roadway bridge above a new future railroad right-of-way

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Jersey

City

North Bergen

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Rail, Water Supply and Storage, Waste Processing and Treatment, Bridge, Power Transmission, Road, Commercial, Power Generation (CCGT)

Article published date

2024-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project