Gateway Tower Apartments
Planning schematics · California · Last reported Aug 2025
Source: Dodge
Partial demolition will be required for two brick-facade industrial structures, including the Herrold College, i.e., City Landmark Number 74, and the Hegerich & Kemling Auto Sales structure. The third structure will be fully demolished. The project will now rise to 15 floors to create 220 affordable housing units and 3,760 square feet of commercial space.
- Status
- Prospective
- Sector
- Steel, Residential, Manufacturing (Industrial), Commercial, Car parking, Automotive
- Location
- San Jose, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Gateway Tower Apartments
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Partial demolition will be required for two brick-facade industrial structures, including the Herrold College, i.e., City Landmark Number 74, and the Hegerich & Kemling Auto Sales structure. The third structure will be fully demolished. The project will now rise to 15 floors to create 220 affordable housing units and 3,760 square feet of commercial space. |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Jose |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Residential, Manufacturing (Industrial), Commercial, Car parking, Automotive |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
