Gateway Village Townhomes Development
Sector: Power Transmission • Location: Bedford, Texas, United States of America
Source: Dodge
Gateway Village is an 11 acre residential townhome project complete with green areas, trails and retention pond on site. Improvements include necessary paving and utilities
- Status
- Closed
- Sector
- Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Residential
- Location
- Bedford, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Gateway Village Townhomes Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Gateway Village is an 11 acre residential townhome project complete with green areas, trails and retention pond on site. Improvements include necessary paving and utilities |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Bedford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Residential |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
