Gateway West Segments 8 & 9

Sector: Power Generation (CCGT) • Location: ID, United States of America

Source: US Department of Transportation (USDOT)

Project
Close

Other Agencies with Actions or Authorizations: Department of the Interior Description: On May 7, 2007, Idaho Power Company and PacifiCorp (doing business as Rocky Mountain Power), applied to the Bureau of Land Management (BLM) for a right-of-way (ROW) grant to use the National System of Public Lands for portions of the Gateway West Transmission Line Project (Gateway West or Project). The original

Project Information FAQ

Project Information

4 Q
The project “Gateway West Segments 8 & 9” is an infrastructure initiative in the Power Generation (CCGT) sector, located in ID, United States of America. Taiyo aggregates data on it from US Department of Transportation (USDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Other Agencies with Actions or Authorizations: Department of the Interior Description: On May 7, 2007, Idaho Power Company and PacifiCorp (doing business as Rocky Mountain Power), applied to the Bureau of Land Management (BLM) for a right-of-way (ROW) grant to use the National System of Public Lands for portions of the Gateway West Transmission Line Project (Gateway West or Project). The original application was revised in October 2007, August 2008, May 2009, and January 2010 to reflect changes and refinements in their proposed Project and in response to public feedback regarding routing alternatives. The BLM published the Final Environmental Impact Statement (FEIS) for this Project on April 26, 2013, and a Record of Decision (ROD) on November 14, 2013. In that ROD, the BLM deferred offering a ROW grant for 2 of the 10 segments (i.e., Segments 8 and 9) to allow additional time for federal, state, and local permitting agencies to examine additional routing options, as well as mitigation and enhancement measures for these segments in and around the Morley Nelson Snake River Birds of Prey National Conservation Area. The Proponents submitted a revised Project application for Segments 8 and 9 in August 2014. Segments 8 and 9 as now proposed would require amendment of one or more BLM land use plans, including the Twin Falls Management Framework Plan (MFP), the 1987 Jarbidge Resource Management Plan (RMP)1, the SRBOP RMP, the Bennett Hills/Timmerman Hills MFP, and the Kuna MFP. On January 19, 2017 the BLM Director signed a record of decision approving Segments 8 and 9 of the Gateway West Transmission Project in which two decisions were made: (1) a decision approving the right-of-way (ROW) grant to use public lands, and (2) a decision approving amendments to five land use plans that are necessary to ensure that the ROW grant would conform to the applicable plans.  Four appeals were filed with the Interior Board of Land Appeals (IBLA) against the BLM decision.  On April 18, 2017 the Gateway decision was remanded to BLM as requested.    On May 5, 2017, House Resolution (H.R.) 2104 - Morley Nelson Snake River Birds of Prey National Conservation Area Boundary Modification Act of 2017 (Modification Act) – was signed into law. The BLM is directed by the Modification Act to issue, within 90 days of the Act, a ROW for the lands described in Sec. 2(b)(2) of the Modification Act for portions of Gateway West Segments 8 and 9.  A ROW grant will be offered by August 3, 2017.  The BLM views this statutory ROW as a connected action affecting the Decision being reconsidered in authorizing segments 8 and 9 for the Gateway West Transmission Project and will prepare an Environmental Assessment and Resource Plan Amemdment to complete the permitting action.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data