Gateway West Transmission Project
Sector: Energy • Location: Idaho, United States
Source: Investing.com
A joint transmission project with PacifiCorp. A joint request for a CPCN was recently filed with the Idaho Commission. A critical section of the line between Hemingway and Midpoint substations is anticipated to come online as early as 2028.
- Status
- Prospective
- Sector
- Energy
- Location
- Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Investing.com
ConstructChat
Ask ConstructChat about Gateway West Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A joint transmission project with PacifiCorp. A joint request for a CPCN was recently filed with the Idaho Commission. A critical section of the line between Hemingway and Midpoint substations is anticipated to come online as early as 2028. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Idaho |
Source
Source | Investing.com |
URL |
More Details
Record type | Project |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
