logo

Gauteng Electrical Infrastructure Load Reduction and Illegal Connection Mitigation

Sector: Power Generation (CCGT) • Location: Soweto, Zondi, Jabulani, Zola, Gauteng, South Africa

Source: Central News South Africa

Project
Under Implementation

Eskom is addressing a power supply crisis in Gauteng caused by illegal electricity connections and non-technical losses amounting to R7 billion annually. The crisis has led to load reduction measures across the province, affecting areas such as Zondi, Jabulani, and Zola, with prolonged and erratic power outages. The project involves tackling electricity theft, conducting transformer audits, target

Project Information FAQ

Project Information

5 Q
The project “Gauteng Electrical Infrastructure Load Reduction and Illegal Connection Mitigation” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Soweto, Zondi, Jabulani, Zola, Gauteng, South Africa. Taiyo aggregates data on it from Central News South Africa.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Under Implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Eskom is addressing a power supply crisis in Gauteng caused by illegal electricity connections and non-technical losses amounting to R7 billion annually. The crisis has led to load reduction measures across the province, affecting areas such as Zondi, Jabulani, and Zola, with prolonged and erratic power outages. The project involves tackling electricity theft, conducting transformer audits, targeted disconnects of illegal taps, infrastructure upgrades in hotspots like Soweto, Alexandra, and Diepsloot, and enforcement measures including fines and legal prosecution. The goal is to reduce load reduction hours, safeguard the electrical network, and improve service reliability.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data