GB3 Power Plant
Sector: Wind • Location: Malaysia
Source: World Bank Group
GB3 was a 640MW natural gas fired expansion of the existing Lumut plant in the northern Perak state. The original Lumut plant had a 1,303-MW capacity and was constructed, owned and operated by Segari Energy Venture, a Malakoff Bhd. majority owned company. The expansion was to occur in two phases. It was to be developed initially as a 430 MW open-cycle gas turbine power plant, later converted in
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | GB3 was a 640MW natural gas fired expansion of the existing Lumut plant in the northern Perak state. The original Lumut plant had a 1,303-MW capacity and was constructed, owned and operated by Segari Energy Venture, a Malakoff Bhd. majority owned company. The expansion was to occur in two phases. It was to be developed initially as a 430 MW open-cycle gas turbine power plant, later converted into a 650 MW combined-cycle gas turbine power plant. The conversion was completed on January 31, 2003. The project was being developed by GB3 Sdn Bhd, a private company that was a 100% subsidiary of Malakoff Bhd. In June of 2001, Malaysian state-controlled power utility Tenaga Nasional Bhd (TNB) agreed to buy a 20% stake in GB3 Sdn. TNB also signed a power purchase agreement (PPA) to buy power from the plant at 12.14 Malaysian cents per kilowatt-hour for a 21-year period. GB3 was selling 91.5% of the power it genertated to TNB by 2004. The Employees Provident Fund's subscription of a further 50,000 GB3 shares (5%) on August 29, 2003 brought Malakoff's ownership to 75%. The company entered into agreements on engineering, procurement and construction (EPC) with a French company, Altsom Power Asia Pacific Sdn Bhd. for Alstom to undertake turnkey construction of the power plant. The GB3 project began commercial operations on three 143-MW open cycle gas turbines in February 2002. Financial closure was achieved on December 20, 2001. RM850 million (US$224 million) was raised through Islamic bonds. Aseanbankers Malaysia Berhad and Citibank Berhad jointly managed the project financing which was based on a debt equity ratio of 80:20. The total cost of the project was around US$394 million. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
