GBRA WaterSECURE Project
Planned · Texas · Last reported Jul 2025
Source: Community Impact
The Guadalupe-Blanco River Authority is working on a nearly $5.9 billion water expansion project to provide water across the region. The project involves extensive infrastructure including a large water treatment plant, multiple pump and booster stations, an aquifer storage and recovery facility, and over 250 miles of pipeline. The project aims to leverage Lower Guadalupe River surface water right
- Status
- Prospective
- Sector
- Water Supply and Storage, Government
- Location
- Fair Oaks Ranch, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Community Impact
ConstructChat
Ask ConstructChat about GBRA WaterSECURE Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Guadalupe-Blanco River Authority is working on a nearly $5.9 billion water expansion project to provide water across the region. The project involves extensive infrastructure including a large water treatment plant, multiple pump and booster stations, an aquifer storage and recovery facility, and over 250 miles of pipeline. The project aims to leverage Lower Guadalupe River surface water rights owned by GBRA and requires municipalities within the project area to sign a Memorandum of Understanding before starting. |
Original sector | Water Supply |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Fair Oaks Ranch |
Source
Source | Community Impact |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in USA
- Replacement of Badger Turbo Meters
- Golf Maintenance Building - Water Heater
- Replaced a 2" domestic water line
- Chill Water Pump Issue
- Pilot Program to Increase Water Supply
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
- SR A1A/Collins Ave from 44 St to 4700 blk and Indian Creek from 41 St to 44 St and SR 112/W 41 St over the Indian Creek Waterway bridge
- Replace 3" domestic water meter located in mechanical room 088
