logo

GCC Interconnection Project

Sector: Advanced Electronics • Location: Saudi Arabia

Source: Hyundai Engineering

Project
Closed

Built hope in the land of desertThe eastern part of Saudi Arabia bordering with Kuwait, Qatar, UAE, Oman, and Yemen is located in the Gulf coast. There were people offering the light of life to this desert in the name of Hyundai E&C. They are the ones made the seemingly impossible Saudi’s 400kV transmission line construction site in GCC possible with the passion more enthusiastic than the heat of

Project Information FAQ

Project Information

5 Q
The project “GCC Interconnection Project” is an infrastructure initiative in the Advanced Electronics sector, located in Saudi Arabia. Taiyo aggregates data on it from Hyundai Engineering.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Built hope in the land of desertThe eastern part of Saudi Arabia bordering with Kuwait, Qatar, UAE, Oman, and Yemen is located in the Gulf coast. There were people offering the light of life to this desert in the name of Hyundai E&C. They are the ones made the seemingly impossible Saudi’s 400kV transmission line construction site in GCC possible with the passion more enthusiastic than the heat of the desert sun.Transmission line crossing the GCC regionThe site of ‘Saudi’s GCC 400kV Transmission Line’ is a section located in Saudi Arabia among transmission lines that connect countries in the GCC region. Based on this section, Hyundai E&C combined·operated two sites of SEC 300kV (ST388, ST389). The combined site was linked from Ghunan, located east of Saudi, to Khurais, Qurayyah, Fadhili, and Salwa, the border of Qatar. The entire railway line was equivalent to 800 km, a round-trip distance from Seoul to Busan.The combined site symbolized the construction of connecting the GCC countries, so from the tendering stage, the competition was fierce among global countries. If the construction was completed, the project could contribute to resolving power shortage in the GCC countries and the construction company could take the initiative in the transmission line market of the Saudi and other Middle East countries. Hyundai E&C successfully won the contract in 2005 by being recognized for its technical prowess shown in the past successful projects in Saudi. The spirit of Hyundai E&C overcame strong dust stormThe eastern part of Saudi records 50℃ in summer, but the temperature drops to around 2~3℃ during winter. Moreover, the strong dust storm has an enormous impact on the site where high-altitude work needs to be conducted more than 60m above ground.However, all our employees kept the promise with the ordering organization on the honor of Hyundai E&C. Accordingly, the ST388 construction was recorded as the only project completed on the agreed schedule among all other projects ordered by SEC-EOA in the midst of bad weather including dust storm. It usually takes more than a year to issue the Final Acceptance Certificate (FAC) after the Provisional Acceptance Certificate (PAC) is issued. However, the SEC-EOA unprecedentedly issued the FAC before completely sending an electric current. Hyundai E&C also made a great impression to the SEC-EOA by completing a certain section of the GT site earlier than the pre-defined schedule. Accordingly, the SEC-EOA showed the great reliability by paying the retention money for PAC to Hyundai E&C in early stages as an expression of gratitude.The technical competence of Hyundai E&C out-glittered in the combined site. The SEC-EOA usually outsourced a steel tower design and basic design to a third-party design company according to its internal regulation. However, it gave an exception only to Hyundai E&C. In other words, our outstanding capability in basic design was recognized by the SEC-EOA since we clearly solved a big challenge even difficult to a technology company. Such efforts allowed us not only to save the budget, but also to become a representative success case in the overseas construction project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data