logo

GDOT/Intra-Government Agreements Utility Relocation

Sector: Bridge • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
Active / Design & Construction

GDOT and other local municipal governments may require the relocation or adjustment of utility facilities to facilitate transportation projects. These projects result from situations where road, bridge, and drainage improvements conflict with existing water and sewer lines. The responsibility and cost of relocating these lines is generally assigned to the utility owner, who is required to move the

Project Information FAQ

Project Information

5 Q
The project “GDOT/Intra-Government Agreements Utility Relocation” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active / design & construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

GDOT and other local municipal governments may require the relocation or adjustment of utility facilities to facilitate transportation projects. These projects result from situations where road, bridge, and drainage improvements conflict with existing water and sewer lines. The responsibility and cost of relocating these lines is generally assigned to the utility owner, who is required to move them to maintain uninterrupted service. DWM anticipates 50 or more projects over the next five years, including projects to be undertaken under the Renew Atlanta Infrastructure Bond. These projects will be located across all City Council District(s): as well as sites where the water or wastewater service area extends beyond City limits. The GDOT projects will be identified by expected bid let date. Typical projects will include bridge replacements, road widening, other roadway improvements, sidewalks and streetscape improvements, or milling and resurfacing. Services will be provided by an Architectural/Engineering Joint Venture. The scope of this project includes: The Consultant will assist the procurement documents associated with the GI Design Challenge Projects. The Department of Watershed Management’s (DWM) Green Infrastructure Design Challenge (GI Challenge) advances Atlanta’s continuing efforts to implement GI in City watersheds. The GI Challenge aims to engage the design community to construct innovative and practical GI solutions in the City, foster City and community involvement, and provide environmental improvements and neighborhood enhancements. Justification: The objective of installing green infrastructure elements is generally to provide runoff volume storage/reduction to address flooding and/or capacity relief, stream restoration, community education, and other green infrastructure objectives as described above.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data