GE Booth and Clarkson WWTP ICP Consolidation
Sector: Manufacturing (Industrial) • Location: Peel, Ontario, Canada
Source: Dodge USA
ICP Consolidation for GE Booth and Clarkson WWTP. The Work of this Contract comprises general construction associated with: Mobilization. Staged ICP consolidation for all processes at Clarkson WWTP and GE Booth WWTP. This includes but is not limited to, Fabrication and installation of new ICPs and CCPs. ICP and CCP power modifications; Relocate existing equipment and electrical conduits to suit th
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Telecommunications, Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
- Location
- Peel, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about GE Booth and Clarkson WWTP ICP Consolidation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ICP Consolidation for GE Booth and Clarkson WWTP. The Work of this Contract comprises general construction associated with: Mobilization. Staged ICP consolidation for all processes at Clarkson WWTP and GE Booth WWTP. This includes but is not limited to, Fabrication and installation of new ICPs and CCPs. ICP and CCP power modifications; Relocate existing equipment and electrical conduits to suit the installation of new panels; Network infrastructure modifications (e.g. hardware, cabling, new p... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Peel |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Telecommunications, Waste Processing and Treatment, Government, Commercial, Water Supply and Storage |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
