GE Road College of Engineering Solar Array
Sector: Car parking • Location: Bloomington, Illinois, United States
Source: WGLT
Illinois State University proposes a $16.5 million solar array installation on the roofs, grounds, and parking structures at its College of Engineering campus on GE Road to reduce energy costs and serve as a learning lab for students.
- Status
- Prospective
- Sector
- Car parking, Solar, Education, Road, Automotive
- Location
- Bloomington, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- WGLT
ConstructChat
Ask ConstructChat about GE Road College of Engineering Solar Array
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Illinois State University proposes a $16.5 million solar array installation on the roofs, grounds, and parking structures at its College of Engineering campus on GE Road to reduce energy costs and serve as a learning lab for students. |
Original sector | Built Sector |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Bloomington |
Source
Source | WGLT |
URL |
More Details
Record type | Project |
Sector | Car parking, Solar, Education, Road, Automotive |
Article published date | 2025-12-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
