logo
ProjectClosed

GEA Offices / JAA Arquitectos

The status, timeline and source of this project. A free account opens every field.

Source: ArchDaily

The hanging lamps were made with an iron frame and then covered with jute thread. In the front of the commercial space, under the same design criteria, a coffee bar was added, which was covered in cut gray marble so that it looked like a monolithic block, which serves the general users of the commercial plaza.Text description provided by the architects.Built on top of a commercial space with a cen

Status
Closed
Sector
Metal, Residential, Steel, Commercial
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about GEA Offices / JAA Arquitectos

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “GEA Offices / JAA Arquitectos” is an infrastructure initiative in the Metal sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The hanging lamps were made with an iron frame and then covered with jute thread. In the front of the commercial space, under the same design criteria, a coffee bar was added, which was covered in cut gray marble so that it looked like a monolithic block, which serves the general users of the commercial plaza.Text description provided by the architects.Built on top of a commercial space with a central structural pillar, a cross-shaped modulation was proposed to generate the four spaces requested by the client. The division was generated through low and thick walls made of steel structures, which were covered with rectangular clay tiles. These walls allowed for embedding bookshelves and storage areas due to their ample depth. At the top of these walls, clear glass was placed to allow light to pass from the windows facing the exterior to the more secluded spaces. The fronts of the office spaces and conference room were generated through wooden frames and textured glass partitions to provide the necessary privacy without interrupting the entry of natural light. The entrance hall greets the user with a wall covered in natural stone from petrified roots, which reminds us of the company's essence and its sustainable commitment to the environment.The furniture was also commissioned by the client, carefully designed for each space to fulfill its function and integrate into the spaces as accurately as possible. The courtesy luminaires on the walls were custom-made to fit the dimensions of the clay tiles and generate indirect lighting inside the offices.Regarding the materiality of the project, a fired clay tile was chosen to create a comfortable and welcoming work atmosphere for the user. This first terracotta strip, with a height of 2.10m, provides a sense of spaciousness in a space that was confined by four walls and two windows. American oak wood was part of the set of tones that the project was generating and revealing.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Metal, Residential, Steel, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project