Geddes Solar Power Project
One of 10,000+ projects Taiyo tracks in New York.
Source: TechBullion
The 3.79 MW Geddes Solar Power Project in New York State is a utility-scale ground-mounted solar project built on a repurposed landfill. It delivers clean, renewable energy sufficient to power approximately 450 homes annually. The project also supports PowerBank's Bitcoin treasury strategy by allocating net cash flows to acquire Bitcoin, blending energy generation with digital asset investment.
- Status
- Closed
- Sector
- Solar, Power Transmission, Power Generation (CCGT)
- Location
- Geddes, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- TechBullion
ConstructChat
Ask ConstructChat about Geddes Solar Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 3.79 MW Geddes Solar Power Project in New York State is a utility-scale ground-mounted solar project built on a repurposed landfill. It delivers clean, renewable energy sufficient to power approximately 450 homes annually. The project also supports PowerBank's Bitcoin treasury strategy by allocating net cash flows to acquire Bitcoin, blending energy generation with digital asset investment. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | New York |
City | Geddes |
Source
Source | TechBullion |
URL |
More Details
Record type | Project |
Sector | Solar, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
