Gedebage - Tasikmalaya - Cilacap Toll Road concession
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project involves the construction of the 206.65km Gedebage - Tasikmalaya - Cilacap Toll Road connecting the West and the East of Java Province, Indonesia. The project is divided in four stages : Section 1 Junction Gedebage-Garut Utara is 45.20 km; section 2 North Garut-Tasikmalaya is 50.32 km; section 3 Tasikmalaya-Patimuan is 76.78 km; section 4 Patimuan-Cilacap is 34.35 km. The sponsor conso
- Status
- Prospective
- Sector
- Commercial, Road, Government
- Location
- Badulla, Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Gedebage - Tasikmalaya - Cilacap Toll Road concession
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of the 206.65km Gedebage - Tasikmalaya - Cilacap Toll Road connecting the West and the East of Java Province, Indonesia. The project is divided in four stages : Section 1 Junction Gedebage-Garut Utara is 45.20 km; section 2 North Garut-Tasikmalaya is 50.32 km; section 3 Tasikmalaya-Patimuan is 76.78 km; section 4 Patimuan-Cilacap is 34.35 km. The sponsor consortium includes both private and state-owned entities. The private companies involved are Daya Mulia Turangga, Jasa Sarana and Gama Group with a combined 27.5% stake, while the SOEs are Jasa Marga (32.5%), Pembangunan Perumahan (10%), Waskita Karya (20%), Wijaya Karya (10%). The total project cost is $3920m, of which 30% or $1167m is provided by the sponsors, while the other 70% or $2753m were provided with a loan from banks from the state-owned Banks Association (HIMBARA) and other financial institutions. The financial close date is January 31st, 2022. https://en.antaranews.com/news/208353/gedebage-tasikmalaya-cilacap-toll-road-project-to-begin-in-2022-bpjt https://www.jasamarga.com/public/en/activity/detailactivity.aspx?title=The%20Gedebage-Tasikmalaya-Cilacap%20Toll%20Road%20is%20Present%20to%20Ensure%20the%20Smooth%20Distribution%20of%20Goods%20and%20Logistics%20Services%20in%20Southern%20Java%20Island https://www.pwc.com/id/en/media-centre/infrastructure-news/january-2022/toll-road-project-jsmr-consortium-wins-a-massive-tender.html https://www.pwc.com/id/en/media-centre/infrastructure-news/february-2022/building-the-longest-toll-road-jasa-marga-consortium-prepares-rp562-trillion.html |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Indonesia |
State | Badulla |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Government |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
