logo

Gedebage - Tasikmalaya - Cilacap Toll Road concession

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

The project involves the construction of the 206.65km Gedebage - Tasikmalaya - Cilacap Toll Road connecting the West and the East of Java Province, Indonesia. The project is divided in four stages : Section 1 Junction Gedebage-Garut Utara is 45.20 km; section 2 North Garut-Tasikmalaya is 50.32 km; section 3 Tasikmalaya-Patimuan is 76.78 km; section 4 Patimuan-Cilacap is 34.35 km. The sponsor conso

Status
Prospective
Sector
Road, Government, Commercial
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Gedebage - Tasikmalaya - Cilacap Toll Road concession

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Gedebage - Tasikmalaya - Cilacap Toll Road concession” is an infrastructure initiative in the Road sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the construction of the 206.65km Gedebage - Tasikmalaya - Cilacap Toll Road connecting the West and the East of Java Province, Indonesia. The project is divided in four stages : Section 1 Junction Gedebage-Garut Utara is 45.20 km; section 2 North Garut-Tasikmalaya is 50.32 km; section 3 Tasikmalaya-Patimuan is 76.78 km; section 4 Patimuan-Cilacap is 34.35 km. The sponsor consortium includes both private and state-owned entities. The private companies involved are Daya Mulia Turangga, Jasa Sarana and Gama Group with a combined 27.5% stake, while the SOEs are Jasa Marga (32.5%), Pembangunan Perumahan (10%), Waskita Karya (20%), Wijaya Karya (10%). The total project cost is $3920m, of which 30% or $1167m is provided by the sponsors, while the other 70% or $2753m were provided with a loan from banks from the state-owned Banks Association (HIMBARA) and other financial institutions. The financial close date is January 31st, 2022. https://en.antaranews.com/news/208353/gedebage-tasikmalaya-cilacap-toll-road-project-to-begin-in-2022-bpjt https://www.jasamarga.com/public/en/activity/detailactivity.aspx?title=The%20Gedebage-Tasikmalaya-Cilacap%20Toll%20Road%20is%20Present%20to%20Ensure%20the%20Smooth%20Distribution%20of%20Goods%20and%20Logistics%20Services%20in%20Southern%20Java%20Island https://www.pwc.com/id/en/media-centre/infrastructure-news/january-2022/toll-road-project-jsmr-consortium-wins-a-massive-tender.html https://www.pwc.com/id/en/media-centre/infrastructure-news/february-2022/building-the-longest-toll-road-jasa-marga-consortium-prepares-rp562-trillion.html

Original sector

Transport

Procurement method

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project