Geele Pond Improvements
Sector: Water Supply and Storage • Location: Sheboygan, Wisconsin, United States of America
Source: Dodge USA
The stormwater pond at the intersection of Geele Avenue and North 29th requires cleaning and restoration. This project will convert the existing dry pond to a wet pond to meet DNR requirements for total suspended solids in our annual permit. This will include control equipment to be purchased and installed in 2024 because current equipment on site is obsolete and unable to be repaired.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The stormwater pond at the intersection of Geele Avenue and North 29th requires cleaning and restoration. This project will convert the existing dry pond to a wet pond to meet DNR requirements for total suspended solids in our annual permit. This will include control equipment to be purchased and installed in 2024 because current equipment on site is obsolete and unable to be repaired. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
