logo
ProjectCompleted

Gemini Solar Project

One of 10,000+ projects Taiyo tracks in Nevada.

Source: Frontiers

The Gemini Solar Project is a utility-scale solar energy facility located in the Mojave Desert, USA. It is a 20 km2 photovoltaic and battery storage facility that utilized novel construction methods to minimize disturbance to soils, vegetation, and hydrology, particularly to protect the habitat of the rare threecorner milkvetch plant species. Construction started in 2022 and ended in 2023. The pro

Status
Closed
Sector
Power Transmission, Energy Storage, Commercial, Solar, Power Generation (CCGT), Residential, Water Supply and Storage, Government
Location
Las Vegas, Nevada, United States of America
Updated
22 Jul 2026
Source
Frontiers

ConstructChat

Ask ConstructChat about Gemini Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Gemini Solar Project” is an infrastructure initiative in the Power Transmission sector, located in Las Vegas, Nevada, United States. Taiyo aggregates data on it from Frontiers.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Gemini Solar Project is a utility-scale solar energy facility located in the Mojave Desert, USA. It is a 20 km2 photovoltaic and battery storage facility that utilized novel construction methods to minimize disturbance to soils, vegetation, and hydrology, particularly to protect the habitat of the rare threecorner milkvetch plant species. Construction started in 2022 and ended in 2023. The project aimed to preserve viable seed banks and maintain ecological function while supporting renewable energy development.

Original sector

Energy

Location

Country

United States of America (USA)

State

Nevada

City

Las Vegas

Source

Source

Frontiers

URL

More Details

Record type

Project

Sector

Power Transmission, Energy Storage, Commercial, Solar, Power Generation (CCGT), Residential, Water Supply and Storage, Government

Article published date

2025-11-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project