Generadora Acajutla S.A. de C.V.
Sector: Wind • Location: Sonsonate, El Salvador
Source: World Bank Group
The GT Acajutla generation plant is located close to the port of Acajutla, approximately 85-km west of San Salvador and 60-km south of Santa Ana and consists of two bunker-fired steam units and three diesel fired gas turbines. On July 30, 1999 Comision Ejecutiva Hidroelectrica del Rio Lempa (CEL) sold 80% of its shares to Duke Energy International for $124 million. The financial closure was reache
- Status
- Prospective
- Sector
- Wind, Power Generation (CCGT), Seaport, Natural Gas, Government
- Location
- Sonsonate, El Salvador
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Generadora Acajutla S.A. de C.V.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The GT Acajutla generation plant is located close to the port of Acajutla, approximately 85-km west of San Salvador and 60-km south of Santa Ana and consists of two bunker-fired steam units and three diesel fired gas turbines. On July 30, 1999 Comision Ejecutiva Hidroelectrica del Rio Lempa (CEL) sold 80% of its shares to Duke Energy International for $124 million. The financial closure was reached on Sept. 3, 1999. The main competitors are: Division Generadora Hidroelectrica de CEL (388-MW), Geotermica Salvadorena (151-MW), Generadora Salvadorena (87.4-MW) and several small generators (50-MW). Duke Energy will invest $75-million in the modernization of this company which will add approximately 100-MW of combined-cycle electric generation. In Nov. 2000, Duke Energy completed the expansion of the power plant, which brought the total capacity to 290 MW. In December 2016, Duke sold all its Latin American assets to Orazul for US$ 1.2 billion. |
Original sector | Energy |
Budget |
Location
Country | El Salvador |
State | Sonsonate |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Seaport, Natural Gas, Government |
Article published date | 2024-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
