General Construction Piling Work Minette Min Substation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
To eliminate the risk of bidder disqualification based on failure to re-submit in response to an Amendment, as required by the new BC Bid rules, BC Hydro has changed its practice as of November 24, 2022, such that all changes to BC Hydro (including Q&As and Addenda) are now treated as Addenda (and not Amendments ) within the BC Bid rules and, as such, no longer require re-submission by the bidder
- Status
- Closed
- Sector
- Hydro, Government, Power Generation (CCGT), Commercial
- Location
- Vancouver, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about General Construction Piling Work Minette Min Substation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To eliminate the risk of bidder disqualification based on failure to re-submit in response to an Amendment, as required by the new BC Bid rules, BC Hydro has changed its practice as of November 24, 2022, such that all changes to BC Hydro (including Q&As and Addenda) are now treated as Addenda (and not Amendments ) within the BC Bid rules and, as such, no longer require re-submission by the bidder of any already made submission. Please see Addenda instructions for further information. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Vancouver |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Hydro, Government, Power Generation (CCGT), Commercial |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
