General-Express-Building Construction:9808/Scranton
Inspection followup · United States
Source: City of San Diego Development Permits
MIRA MESA: Building, Mechanical and Electrical permits for a proposed Installation of Five new VRV Condensing units located on the roof of an existing four story building. The condensing units will serve indoor unit fan coils located on the 2nd floor. The indoor fan coil units and piping will be installed under separate permit/TI.
- Status
- Prospective
- Sector
- Commercial
- Location
- San Diego, United States of America
- Updated
- 19 Nov 2026
- Source
- City of San Diego Development Permits
ConstructChat
Ask ConstructChat about General-Express-Building Construction:9808/Scranton
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | inspection followup |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | MIRA MESA: Building, Mechanical and Electrical permits for a proposed Installation of Five new VRV Condensing units located on the roof of an existing four story building. The condensing units will serve indoor unit fan coils located on the 2nd floor. The indoor fan coil units and piping will be installed under separate permit/TI. |
Original sector | Add/Alt NonRes Bldg or Struct |
Location
Country | United States of America (USA) |
City | San Diego |
Source
Source | City of San Diego Development Permits |
URL |
More Details
Record type | Project |
Sector | Commercial |
Article published date | 2026-04-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
