logo
ProjectClosed

GENERTN RCOVRY&IMPRV

One of 1,865 projects Taiyo tracks in Jamaica.

Source: World Bank Group

The Generation Recovery and Improvement Project has the fololwing objectives: 1) to restore electricity service to normal conditions as early as possible, thus eliminating costly power cuts; 2) to reduce generation costs through lower running cost plants, save on capital costs by upgrading existing facilities and safeguard the system against the breakdown of existing units due to extended use; 3)

Status
Closed
Sector
Power Transmission, Wind, Seaport, Government, Power Generation (CCGT)
Location
Jamaica
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about GENERTN RCOVRY&IMPRV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “GENERTN RCOVRY&IMPRV” is an infrastructure initiative in the Power Transmission sector, located in Jamaica. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Generation Recovery and Improvement Project has the fololwing objectives: 1) to restore electricity service to normal conditions as early as possible, thus eliminating costly power cuts; 2) to reduce generation costs through lower running cost plants, save on capital costs by upgrading existing facilities and safeguard the system against the breakdown of existing units due to extended use; 3) to improve generation security, enhance system reliability and control systems to reduce the likelihood of future recurrence of generating plant incidents by improving the telecommunications and energy control systems and by reinforcing the transmission network; 4) to improve resource allocation through the reform of electricity tariffs and ensure that loss of base load generation capacity does not adversely affect the environment for increasing private sector participation in the power sector; and 4) to reduce and control the environmental impact associated with power system facilities. To achieve these objectives the project comprises several components. The first is a restoration of Old Habor (OH) unit 3 and OH unit 4 boiler. Second, the project calls for life extension of OH unit 4 generation turbine and upgrades for gas turbine units 3, 4 and 5. Transmission system reinforcements and ugrading of the energy control center and associated telecommunications facilities are also major concerns. Additionally, consulting services will be required for technical supervision and project management for the generating system components of the project; engineering and management for the environmental mitigation component of the project; and cost of service and tariff reform studies.

Original sector

Energy and Extractives

Budget

Location

Country

Jamaica

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Wind, Seaport, Government, Power Generation (CCGT)

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project