GENERTN RCOVRY&IMPRV
One of 1,865 projects Taiyo tracks in Jamaica.
Source: World Bank Group
The Generation Recovery and Improvement Project has the fololwing objectives: 1) to restore electricity service to normal conditions as early as possible, thus eliminating costly power cuts; 2) to reduce generation costs through lower running cost plants, save on capital costs by upgrading existing facilities and safeguard the system against the breakdown of existing units due to extended use; 3)
- Status
- Closed
- Sector
- Power Transmission, Wind, Seaport, Government, Power Generation (CCGT)
- Location
- Jamaica
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about GENERTN RCOVRY&IMPRV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Generation Recovery and Improvement Project has the fololwing objectives: 1) to restore electricity service to normal conditions as early as possible, thus eliminating costly power cuts; 2) to reduce generation costs through lower running cost plants, save on capital costs by upgrading existing facilities and safeguard the system against the breakdown of existing units due to extended use; 3) to improve generation security, enhance system reliability and control systems to reduce the likelihood of future recurrence of generating plant incidents by improving the telecommunications and energy control systems and by reinforcing the transmission network; 4) to improve resource allocation through the reform of electricity tariffs and ensure that loss of base load generation capacity does not adversely affect the environment for increasing private sector participation in the power sector; and 4) to reduce and control the environmental impact associated with power system facilities. To achieve these objectives the project comprises several components. The first is a restoration of Old Habor (OH) unit 3 and OH unit 4 boiler. Second, the project calls for life extension of OH unit 4 generation turbine and upgrades for gas turbine units 3, 4 and 5. Transmission system reinforcements and ugrading of the energy control center and associated telecommunications facilities are also major concerns. Additionally, consulting services will be required for technical supervision and project management for the generating system components of the project; engineering and management for the environmental mitigation component of the project; and cost of service and tariff reform studies. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Jamaica |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Wind, Seaport, Government, Power Generation (CCGT) |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
