GENERTN RCOVRY&IMPRV
Sector: Power Transmission • Location: Jamaica
Source: World Bank Group
The Generation Recovery and Improvement Project has the fololwing objectives: 1) to restore electricity service to normal conditions as early as possible, thus eliminating costly power cuts; 2) to reduce generation costs through lower running cost plants, save on capital costs by upgrading existing facilities and safeguard the system against the breakdown of existing units due to extended use; 3)
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Generation Recovery and Improvement Project has the fololwing objectives: 1) to restore electricity service to normal conditions as early as possible, thus eliminating costly power cuts; 2) to reduce generation costs through lower running cost plants, save on capital costs by upgrading existing facilities and safeguard the system against the breakdown of existing units due to extended use; 3) to improve generation security, enhance system reliability and control systems to reduce the likelihood of future recurrence of generating plant incidents by improving the telecommunications and energy control systems and by reinforcing the transmission network; 4) to improve resource allocation through the reform of electricity tariffs and ensure that loss of base load generation capacity does not adversely affect the environment for increasing private sector participation in the power sector; and 4) to reduce and control the environmental impact associated with power system facilities. To achieve these objectives the project comprises several components. The first is a restoration of Old Habor (OH) unit 3 and OH unit 4 boiler. Second, the project calls for life extension of OH unit 4 generation turbine and upgrades for gas turbine units 3, 4 and 5. Transmission system reinforcements and ugrading of the energy control center and associated telecommunications facilities are also major concerns. Additionally, consulting services will be required for technical supervision and project management for the generating system components of the project; engineering and management for the environmental mitigation component of the project; and cost of service and tariff reform studies. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |