logo

GENERTN RCOVRY&IMPRV

Sector: Power Transmission • Location: Jamaica

Source: World Bank Group

Project
Closed

The Generation Recovery and Improvement Project has the fololwing objectives: 1) to restore electricity service to normal conditions as early as possible, thus eliminating costly power cuts; 2) to reduce generation costs through lower running cost plants, save on capital costs by upgrading existing facilities and safeguard the system against the breakdown of existing units due to extended use; 3)

Project Information FAQ

Project Information

5 Q
The project “GENERTN RCOVRY&IMPRV” is an infrastructure initiative in the Power Transmission sector, located in Jamaica. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Generation Recovery and Improvement Project has the fololwing objectives: 1) to restore electricity service to normal conditions as early as possible, thus eliminating costly power cuts; 2) to reduce generation costs through lower running cost plants, save on capital costs by upgrading existing facilities and safeguard the system against the breakdown of existing units due to extended use; 3) to improve generation security, enhance system reliability and control systems to reduce the likelihood of future recurrence of generating plant incidents by improving the telecommunications and energy control systems and by reinforcing the transmission network; 4) to improve resource allocation through the reform of electricity tariffs and ensure that loss of base load generation capacity does not adversely affect the environment for increasing private sector participation in the power sector; and 4) to reduce and control the environmental impact associated with power system facilities. To achieve these objectives the project comprises several components. The first is a restoration of Old Habor (OH) unit 3 and OH unit 4 boiler. Second, the project calls for life extension of OH unit 4 generation turbine and upgrades for gas turbine units 3, 4 and 5. Transmission system reinforcements and ugrading of the energy control center and associated telecommunications facilities are also major concerns. Additionally, consulting services will be required for technical supervision and project management for the generating system components of the project; engineering and management for the environmental mitigation component of the project; and cost of service and tariff reform studies.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data