Genesis Drive Water Extension
Sector: Water Supply and Storage • Location: Richmond Hill, Georgia, United States of America
Source: Dodge USA
The scope of work includes the furnishment and installation of approximately 1200 LF of 16-inch water main and 5200 LF of 8-inch force main along Genesis Drive. The work shall include jack and bores, plug valves, butterfly valves, air release valves, fire hydrants, and all other appurtenances necessary to complete the project.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government, Raw Materials
- Location
- Richmond Hill, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Genesis Drive Water Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work includes the furnishment and installation of approximately 1200 LF of 16-inch water main and 5200 LF of 8-inch force main along Genesis Drive. The work shall include jack and bores, plug valves, butterfly valves, air release valves, fire hydrants, and all other appurtenances necessary to complete the project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Richmond Hill |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Raw Materials |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
