Gentuk Browns Lake Tungsten Project Restart
Sector: Mining • Location: Dillon, Montana, United States
Source: AD HOC NEWS
The project involves the restart of production at the Gentung Browns Lake tungsten project located on a former Union Carbide site in Dillon, Montana. The project has a resource of 7.53 million tonnes and is planned to restart production by the end of 2026.
- Status
- Prospective
- Sector
- Mining
- Location
- Dillon, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- AD HOC NEWS
ConstructChat
Ask ConstructChat about Gentuk Browns Lake Tungsten Project Restart
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the restart of production at the Gentung Browns Lake tungsten project located on a former Union Carbide site in Dillon, Montana. The project has a resource of 7.53 million tonnes and is planned to restart production by the end of 2026. |
Original sector | Mining |
Location
Country | United States of America (USA) |
State | Montana |
City | Dillon |
Source
Source | AD HOC NEWS |
URL |
More Details
Record type | Project |
Article published date | 2026-04-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
