George B. Prindle WTP Flocculation Basin Gate Replacement
Sector: Water Supply and Storage • Location: Highland Park, Illinois, United States of America
Source: Dodge USA
Water Treatment Plant Gate Replacement -- The Work to be done under this Contract consists of demolition of a slide gate and manual handwheel operator and construction of a new slide gate and manual handwheel operator at the George B. Prindle Water Plant as shown and specified in the Contract Documents titled 1929 Flocculation Basin Gate Replacement. The Work includes: 1. Furnishing of all labor,
- Status
- Prospective
- Sector
- Water Supply and Storage, Car parking, Automotive, Government, Commercial, Waste Processing and Treatment
- Location
- Highland Park, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about George B. Prindle WTP Flocculation Basin Gate Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Water Treatment Plant Gate Replacement -- The Work to be done under this Contract consists of demolition of a slide gate and manual handwheel operator and construction of a new slide gate and manual handwheel operator at the George B. Prindle Water Plant as shown and specified in the Contract Documents titled 1929 Flocculation Basin Gate Replacement. The Work includes: 1. Furnishing of all labor, material, superintendence, light, heat, fuel, water, tools, equipment, supplies, services and oth... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Highland Park |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Automotive, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
