George Harrison Soccer Complex Phase 2
One of 10,000+ projects Taiyo tracks in Mississippi.
Source: Dodge
The project consists of the installation of soccer fields, a concession building, parking, fencing, lighting, irrigation, and signage within the City of Olive Branch MS.--Work includes vegetation removal, site grading, demolition, concession building, drainage installation, asphalt and concrete paving, signage, fencing, and installation of soccer fields, utilities, landscaping, irrigation and ligh
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Consumer Products, Power Transmission, Manufacturing (Industrial), Car parking, Commercial, Power Generation (CCGT), Road, Automotive, Waste Processing and Treatment
- Location
- Olive Branch, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about George Harrison Soccer Complex Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the installation of soccer fields, a concession building, parking, fencing, lighting, irrigation, and signage within the City of Olive Branch MS.--Work includes vegetation removal, site grading, demolition, concession building, drainage installation, asphalt and concrete paving, signage, fencing, and installation of soccer fields, utilities, landscaping, irrigation and lighting. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Olive Branch |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Consumer Products, Power Transmission, Manufacturing (Industrial), Car parking, Commercial, Power Generation (CCGT), Road, Automotive, Waste Processing and Treatment |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
