Georgetown Loop Railroad Devils Gate High Bridge Paint
One of 10,000+ projects Taiyo tracks in Colorado.
Source: Dodge USA
Prep work for this project will include: Road Closure if necessary, only closing one direction at a time Power clean/wet blast all surfaces being coated Prep to SSPC, Society for Protective Coatings, Standards. All nuts and bolts will be wire wheeled and or wire brushed to clean rust, Prime all bare spots and raw metal using Steel Spec Multi Surfaces Industrial Primer. Prep work for this project w
- Status
- Closed
- Sector
- Metal, Bridge, Power Generation (CCGT), Rail, Road, Steel, Manufacturing (Industrial), Mass Transit, Commercial
- Location
- Georgetown, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Georgetown Loop Railroad Devils Gate High Bridge Paint
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Prep work for this project will include: Road Closure if necessary, only closing one direction at a time Power clean/wet blast all surfaces being coated Prep to SSPC, Society for Protective Coatings, Standards. All nuts and bolts will be wire wheeled and or wire brushed to clean rust, Prime all bare spots and raw metal using Steel Spec Multi Surfaces Industrial Primer. Prep work for this project will include: Road Closure if necessary, only closing one direction at a time Power clean/wet blas... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Georgetown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Bridge, Power Generation (CCGT), Rail, Road, Steel, Manufacturing (Industrial), Mass Transit, Commercial |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
