logo

Georgia CEI HPP

Sector: Power Generation (CCGT) • Location: Georgia

Source: International Finance Corporation (IFC)

Project
Active

The project consists of financing the 185 MW hydro power plant in Adjaritskali, southwest Georgia (the “Project”), co-developed by Clean Energy Invest (“CEI”) and IFC InfraVentures. The Project, called Shuakevi Scheme, is a part of a cascade of 3 run-of-river HPPs (Shuakhevi 185MW, Koromkheti 150MW, and Khertvisi 65MW) in the Adjiaristsqali region. The Project (or Shuakevi Scheme) is comprised o

Project Information FAQ

Project Information

4 Q
The project “Georgia CEI HPP” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Georgia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of financing the 185 MW hydro power plant in Adjaritskali, southwest Georgia (the “Project”), co-developed by Clean Energy Invest (“CEI”) and IFC InfraVentures. The Project, called Shuakevi Scheme, is a part of a cascade of 3 run-of-river HPPs (Shuakhevi 185MW, Koromkheti 150MW, and Khertvisi 65MW) in the Adjiaristsqali region. The Project (or Shuakevi Scheme) is comprised of two dams with reservoirs and one weir on the Adjaristsqali, Skhalta and Chirukhistsqali Rivers respectively. The Project is expected to generate 483 GWh power per year, to export to Turkey through the cross-border transmission line in 9 months of the year, and to sell domestically in 3 consecutive winter months, when Georgia is energy deficient. The proposed investment is an A loan of up to US$70 million, a B loan of up to US$180 million and a straight equity of up to US$25 million. Total project size is expected to be US$356 million, where CEI (owned by Norsk Mineral), Tata Power and IFC will contribute with US$110 million equity (40%, 40% and 20%, respectively). The project company (Adjaristsqali Georgia LLC) will develop the Project. An Environmental and Social Impact Assessment was prepared by Mott MacDonald for Clean Energy Group covering the entire cascade of 3 HPPs. IFC is considering to invest in the first HPP (Shuakhevi 185 MW) of the three HPPs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data