Georgia CEI HPP
Sector: Hydro • Location: Georgia
Source: IFC Project Disclosures
The project consists of financing the 185 MW hydro power plant in Adjaritskali, southwest Georgia (the “Project”), co-developed by Clean Energy Invest (“CEI”) and IFC InfraVentures. The Project, called Shuakevi Scheme, is a part of a cascade of 3 run-of-river HPPs (Shuakhevi 185MW, Koromkheti 150MW, and Khertvisi 65MW) in the Adjiaristsqali region. The Project (or Shuakev
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT)
- Location
- Georgia
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about Georgia CEI HPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project consists of financing the 185 MW hydro power plant in Adjaritskali, southwest Georgia (the “Project”), co-developed by Clean Energy Invest (“CEI”) and IFC InfraVentures. The Project, called Shuakevi Scheme, is a part of a cascade of 3 run-of-river HPPs (Shuakhevi 185MW, Koromkheti 150MW, and Khertvisi 65MW) in the Adjiaristsqali region. The Project (or Shuakevi Scheme) is comprised of two dams with reservoirs and one weir on the Adjaristsqali, Skhalta and Chirukhistsqali Rivers respectively. The Project is expected to generate 483 GWh power per year, to export to Turkey through the cross-border transmission line in 9 months of the year, and to sell domestically in 3 consecutive winter months, when Georgia is energy deficient. The proposed investment is an A loan of up to US$70 million, a B loan of up to US$180 million and a straight equity of up to US$25 million. Total project size is expected to be US$356 million, where CEI (owned by Norsk Mineral), Tata Power and IFC will contribute with US$110 million equity (40%, 40% and 20%, respectively). The project company (Adjaristsqali Georgia LLC) will develop the Project. An Environmental and Social Impact Assessment was prepared by Mott MacDonald for Clean Energy Group covering the entire cascade of 3 HPPs. IFC is considering to invest in the first HPP (Shuakhevi 185 MW) of the three HPPs. |
Original sector | Large Hydro Renewable Energy Generation |
Location
Country | Georgia |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT) |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
