logo
ProjectActive

Georgia CEI HPP

Sector: Hydro • Location: Georgia

Source: IFC Project Disclosures

The project consists of financing the 185 MW hydro power plant in Adjaritskali, southwest Georgia (the “Project”), co-developed by Clean Energy Invest (“CEI”) and IFC InfraVentures. The Project, called Shuakevi Scheme, is a part of a cascade of 3 run-of-river HPPs (Shuakhevi 185MW, Koromkheti 150MW, and Khertvisi 65MW) in the Adjiaristsqali region. The Project (or Shuakev

Status
Prospective
Sector
Hydro, Power Generation (CCGT)
Location
Georgia
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about Georgia CEI HPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Georgia CEI HPP” is an infrastructure initiative in the Hydro sector, located in Georgia. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project consists of financing the 185 MW hydro power plant in Adjaritskali, southwest Georgia (the “Project”), co-developed by Clean Energy Invest (“CEI”) and IFC InfraVentures. The Project, called Shuakevi Scheme, is a part of a cascade of 3 run-of-river HPPs (Shuakhevi 185MW, Koromkheti 150MW, and Khertvisi 65MW) in the Adjiaristsqali region. The Project (or Shuakevi Scheme) is comprised of two dams with reservoirs and one weir on the Adjaristsqali, Skhalta and Chirukhistsqali Rivers respectively. The Project is expected to generate 483 GWh power per year, to export to Turkey through the cross-border transmission line in 9 months of the year, and to sell domestically in 3 consecutive winter months, when Georgia is energy deficient. The proposed investment is an A loan of up to US$70 million, a B loan of up to US$180 million and a straight equity of up to US$25 million. Total project size is expected to be US$356 million, where CEI (owned by Norsk Mineral), Tata Power and IFC will contribute with US$110 million equity (40%, 40% and 20%, respectively). The project company (Adjaristsqali Georgia LLC) will develop the Project. An Environmental and Social Impact Assessment was prepared by Mott MacDonald for Clean Energy Group covering the entire cascade of 3 HPPs. IFC is considering to invest in the first HPP (Shuakhevi 185 MW) of the three HPPs.

Original sector

Large Hydro Renewable Energy Generation

Location

Country

Georgia

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT)

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project