Georgia: Clean, Local, Equitable Access to Reliable Water Program
One of 6,815 projects Taiyo tracks in Georgia.
Source: aiib
AIIB results-based financing (RBF) will support the Government of Georgia’s Vision 2030 and the Water Supply and Sanitation Sector Development Framework 2021–2030, which aim for universal and equitable access to safe and affordable drinking water by 2030. Urban water services in Georgia have improved considerably, while there is a substantial gap in water supply services in rural areas. Only about
- Status
- Prospective
- Sector
- Road, Water Supply and Storage, Government
- Location
- Georgia
- Updated
- 19 Nov 2026
- Source
- aiib
ConstructChat
Ask ConstructChat about Georgia: Clean, Local, Equitable Access to Reliable Water Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | AIIB results-based financing (RBF) will support the Government of Georgia’s Vision 2030 and the Water Supply and Sanitation Sector Development Framework 2021–2030, which aim for universal and equitable access to safe and affordable drinking water by 2030. Urban water services in Georgia have improved considerably, while there is a substantial gap in water supply services in rural areas. Only about a quarter of rural households have a piped connection, and 73% of those connected receive water only part of the day. Many rural systems depend on fragmented unregulated water sources and have little storage, without adequate treatment or water quality testing, increasing their exposure to droughts, heatwaves, and floods. AIIB will co-finance the Program with the Asian Development Bank (ADB), which approved its results-based loan on October 24, 2025. The Program is already under implementation, with AIIB's participation expected to support the Government financing share envisaged at ADB approval. ADB will remain as the lead co-financier, and both ADB and AIIB will channel financing to the same Program scope, results framework and Disbursement Linked Indicators (DLIs) framework under the overall unchanged financing envelope. AIIB will provide financing towards achievement of tangible results within the following Results Areas: Results Area 1: Climate- and disaster-resilient water supply infrastructure. The Program will finance the design and construction of new and rehabilitated water supply systems in at least 100 rural settlements. The aim is to provide new or improved access to safe drinking water, available 24 hours a day, to at least 50,000 households, or about 150,000 people. Water Supply system designs will take account of climate risks, make use of energy-efficient technologies and embed assessment of water source sustainability. Results Area 2: Stronger institutions and governance for rural water services. The Program will help put in place regulations for operating and maintaining rural systems, supported by digital tools, and affordable payment arrangements for household connections. It will also support public awareness work on water conservation and climate responsiveness, a national water supply and sanitation framework for the period beyond 2030, and protocols for managing public investment in the sector. Women’s participation in technical roles will be encouraged, including through a scale-up of the internship program. |
Original sector | Water |
Budget |
Location
Country | Georgia |
Source
Source | aiib |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Government |
Article published date | 2026-11-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
