logo

Georgian Property Debt Facility - Green Building

Sector: Water Supply and Storage • Location: Georgia

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

The proposed project will finance the construction, refurbishment and operation of four commercial properties (two office buildings, one shopping centre and a train station to be renovated to maximise its retail potential) in Tbilisi, capital of the Republic of Georgia. The proposed project is the Bank’s first property debt financing in the Republic of Georgia. Tbilisi property market is at its na

Project Information FAQ

Project Information

4 Q
The project “Georgian Property Debt Facility - Green Building” is an infrastructure initiative in the Water Supply and Storage sector, located in Georgia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project will finance the construction, refurbishment and operation of four commercial properties (two office buildings, one shopping centre and a train station to be renovated to maximise its retail potential) in Tbilisi, capital of the Republic of Georgia. The proposed project is the Bank’s first property debt financing in the Republic of Georgia. Tbilisi property market is at its nascent stage and requires substantial capital recourses for redevelopment of the existing stock as well as for financing of the construction of new properties. The Project significantly contributes to the structure and extent of Tbilisi real estate market by providing supply of quality product to the market which will trigger greater competition in the property sector. In addition to that, the Bank’s investment will facilitate the development of local retail and office real estate sectors, transferring skills and know-how to the local economy during construction, implementation, and management of the three sub-projects through backward linkages in the local construction sectors. Local contractors should be engaged in construction works, which should facilitate skills transfer and upgrade them towards international standards. Four special purpose companied registered in the Republic of Georgia which are majority controlled by Georgian Reconstruction and Development Company N.V. Senior Loan of USD 43.4 million structured as A/B Loan comprising Bank ‘A’ loan of USD 21.7 million and Participants (commercial banks) ‘B’ loan USD 21.7 million. USD 72.3 million. Screening categories and rationale for classification Urban property redevelopment such as this project has specific environmental impacts which, however, can be readily identified and prevented through adequate measures and application of good international practice. For the above reasons, the EBRD has classified the project B/1, requiring an Environmental Analysis and Audit of the proposed site and associated facilities. Information reviewed during the environmental appraisal Reviews of the completed Environmental Questionnaire and relevant documentation have been carried out and site assessments of the four sub-projects in Tbilisi are currently underway. Environmental impacts and mitigation measures Potential environmental issues associated with property redevelopment and operation, which can be readily identified, and mitigated include the following: soil and water contamination at the site; the status of official environmental approvals; cultural and historical heritage; environmental, health and worker safety issues (including potential labour issues) during the construction; traffic impact issues, safety of construction materials; and environmental, life and fire safety aspects during the operation of the sub-projects. Environmental due diligence to date has confirmed that the sub-projects are unlikely to be associated with significant past environmental liabilities as well as health and safety documentation is being prepared for each sub-project. Further environmental due diligence including the site assessments will examine the remaining issues. An Environmental Action Plan (EAP) might be required if any significant shortcomings are identified during the further due diligence. The Sponsor will be required to ensure that each sub-project complies with national and EU environmental, health and safety standards and requirements. To achieve that, the Sponsor will incorporate all necessary preventive and mitigation measures into the project design as well as commit itself to good international practice. Environmental opportunities The project may allow for urban regeneration through the redevelopment of the existing buildings. In addition, the environmental due diligence will examine energy efficiency opportunities. Monitoring The Bank will evaluate the project’s compliance with the applicable environmental and social requirements during the lifetime of the project by reviewing annual environmental reports (AER) prepared for the project covering: (1) on-going performance of project-specific environmental, health and safety programmes if applicable, and (ii) the status of implementation of environmental mitigation measures as well as EAP if required. None. Tbilisi: Irakli Kilauridze, CEO / GRDC N.V. T: +995.32.942207, irakli@grdc.ge London: Daniel Geoghegan, Partner, Argo Saint George LLP T. +44 (0) 207 493 2797, dg@argo-sg.com

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data