Geotechnical Drilling Treaty Creek Terminal Substation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This request for Quotation is issued by BC Hydro for Geotechnical Drilling Work required at our Treaty Creek Terminal (TCT) Substation located near the Bell-Irving Valley, approximately 17 km south of the Bell II Resort on the eastern side of Highway 37 near Kitimat, B.C. Please see the RFQ document for details.
- Status
- Under Construction
- Sector
- Hydro, Hotel, Power Generation (CCGT), Road, Commercial
- Location
- Burnaby, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Geotechnical Drilling Treaty Creek Terminal Substation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This request for Quotation is issued by BC Hydro for Geotechnical Drilling Work required at our Treaty Creek Terminal (TCT) Substation located near the Bell-Irving Valley, approximately 17 km south of the Bell II Resort on the eastern side of Highway 37 near Kitimat, B.C. Please see the RFQ document for details. |
Procurement method |
Location
Country | Canada |
State | British Columbia |
City | Burnaby |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Hotel, Power Generation (CCGT), Road, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Manitoba Hydro High Voltage Test Facility
- Wuskwatim Generating Station
- Manitoba Hydro Dorsey Converter Station
- Beeton Hydroelectric Development
- Thorold Cogeneration Project Ontario Canada
- Claresholm Solar Project Alberta
- Halton Hills Combined Cycle Plant
- Highway Rehab -- Bridge replacement Power Dam Interchange 786, United Counties of Stormont, Dundas and Glengarry
