logo

Gerald Desmond Bridge

Sector: Bridge • Location: United States

Source: FCC Construction

Project
Closed

The project consists of the replacement of Gerald Desmond Bridge, constructed in 1968 over the Back Channel of the Port of Long Beach. It is being replaced for reasons of seismic risk, because of heavy-traffic growth over the coming years and the need for greater vertical clearances for current container ships.The main structure is resolved by means of a cable-stayed bridge with a 305-metre long p

Project Information FAQ

Project Information

3 Q
The project “Gerald Desmond Bridge” is an infrastructure initiative in the Bridge sector, located in United States. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the replacement of Gerald Desmond Bridge, constructed in 1968 over the Back Channel of the Port of Long Beach. It is being replaced for reasons of seismic risk, because of heavy-traffic growth over the coming years and the need for greater vertical clearances for current container ships.The main structure is resolved by means of a cable-stayed bridge with a 305-metre long principal span at 61 metres over the Back Channel and two 152-metre long end spans. The project was designed with two 155-metre maximum height, single-shaft towers, 90 metres above the deck. Each mast has two planes of ten cables from its head to the deck edge. Each tower is cemented over twelve 2.4 metre diameter piles connected by variable octagonal capping between 3 and 4.90 metres. The deck is 47 metres wide and consists of longitudinal metal beams at the ends and transversal metal beams spaced at five metres. Prefabricated, full-edge slabs are positioned on this metal structure with the joints between them being concreted onsite.The approach bridges to the stayed section are 900 metres long on the west side and 1,155 metres long on the east side. These are made up of spans between 57 and 69 metres, with caisson sections, mostly executed onsite with a movable scaffolding system (MSS).To the west of the bridge, an underpass is being executed adjoining the existing one at the intersection between Ocean Boulevard and the SR-47. To the east, the intersection joining Ocean Boulevard to the 710 highway, Pico Avenue and the E and D quays will be remodelled.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data