logo

Geraldton Water Line Rehabilitation Phase II

Sector: Metal • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The objective of this project is to reline old 6" cast-iron water lines in the Municipal drinking water distribution system. As part of a demonstration phase to determine effectiveness, the Municipality engaged a contractor to re-line 1km of the mainline with cement. In 2013 and 2014, the Municipality completed Phase I of the program (7 km). The results were 100% effective at eliminating the issu

Project Information FAQ

Project Information

3 Q
The project “Geraldton Water Line Rehabilitation Phase II” is an infrastructure initiative in the Metal sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of this project is to reline old 6" cast-iron water lines in the Municipal drinking water distribution system. As part of a demonstration phase to determine effectiveness, the Municipality engaged a contractor to re-line 1km of the mainline with cement. In 2013 and 2014, the Municipality completed Phase I of the program (7 km). The results were 100% effective at eliminating the issues noted above and have extended the life of the pipe by upwards of 40 years. Tasks include setting up a temporary mainline bypass to maintain the water supply to homes, accessing, cleaning and lining the pipes, and site rehabilitation. Cement lining is highly effective at preventing corrosion and extending the life of a structurally sound water main upwards of 40 years. The Municipality proposes to undertake Phase II its rehabilitation efforts. Phase II will focus on the areas currently in most urgent need of repair. This project will enable the Municipality to rehabilitate roughly 4 km of deteriorating water lines in the following areas (please see attached map).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data