Gerber Collision Center
Sector: Car parking • Location: Winston Salem, North Carolina, United States of America
Source: Dodge USA
The site involves erosion control, excavation, utilities, retaining wall, opaque wooden fencing, concrete & asphalt paving, striping, concrete sidewalk & curbs, gated trash enclosure, and landscape & irrigation (design built). The building includes concrete foundations, concrete slab, a brick veneer pre-engineered metal building which is fully fire sprinkled, metal studs, insulation, acoustical ce
- Status
- Closed
- Sector
- Car parking, Power Transmission, Cement, Water Supply and Storage, Road, Metal, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Winston Salem, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Gerber Collision Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The site involves erosion control, excavation, utilities, retaining wall, opaque wooden fencing, concrete & asphalt paving, striping, concrete sidewalk & curbs, gated trash enclosure, and landscape & irrigation (design built). The building includes concrete foundations, concrete slab, a brick veneer pre-engineered metal building which is fully fire sprinkled, metal studs, insulation, acoustical ceiling, storefront, overhead doors, hollow metal doors & frames, drywall, painting, sealed concret... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Winston Salem |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Cement, Water Supply and Storage, Road, Metal, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
