Gerdau Landfill Area C Phase II Landfill
Sector: Commercial • Location: Jackson, Tennessee, United States of America
Source: Dodge USA
The Project generally consists of construction of a new area of the landfill, including but not limited to, excavation, grading, placement of 3 thick clay sub-liner, installation of geotextile, geomembrane, geocomposite, geosynthetic clay liner, dual containment HDPE gravity sewer, HDPE manholes, dual containment HDPE force main, in cell leachate collection piping, gravel pack for leachate collect
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Jackson, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Gerdau Landfill Area C Phase II Landfill
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project generally consists of construction of a new area of the landfill, including but not limited to, excavation, grading, placement of 3 thick clay sub-liner, installation of geotextile, geomembrane, geocomposite, geosynthetic clay liner, dual containment HDPE gravity sewer, HDPE manholes, dual containment HDPE force main, in cell leachate collection piping, gravel pack for leachate collection, 15 thick sand drainage layer, in cell leachate pumps and controls, electrical, limestone acc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Jackson |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
