logo

German contribution to Gaza central desalination plant - expansion of water supply infrastructure, Phase III

Sector: Water Supply and Storage • Location: Palestinian territories

Source: KFW Bank aus Verantwortung

Project
Active

The FC project aims to provide around 1 million people in the project areas with a more reliable, safe and affordable water supply by 2025. The project sponsor is the Palestinian Water Authority (PWA). The project region includes the population of the city of Gaza and the communities of Beit Lahia and Jabalia in northern Gaza. The water resources available in the project region are to be used as b

Project Information FAQ

Project Information

5 Q
The project “German contribution to Gaza central desalination plant - expansion of water supply infrastructure, Phase III” is an infrastructure initiative in the Water Supply and Storage sector, located in Palestinian territories. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The FC project aims to provide around 1 million people in the project areas with a more reliable, safe and affordable water supply by 2025. The project sponsor is the Palestinian Water Authority (PWA). The project region includes the population of the city of Gaza and the communities of Beit Lahia and Jabalia in northern Gaza. The water resources available in the project region are to be used as best as possible by blending extracted freshwater with the largely highly saline groundwater in order to improve the drinking water supply and quality for the population. The infrastructure measures required for this include conversion work on existing groundwater wells and their connection to existing or planned water reservoirs; expansion or new construction of the transport system to expand water imports from Israel for the northern Gaza Strip; Expansion, rehabilitation and new construction of structures for water distribution, storage and blending of contaminated groundwater with fresh water from the small-volume existing northern desalination plant as well as operational support and training measures. The total cost of these measures is expected to amount to 55.6 million euros.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data