logo

Gerus Solar Power Plant (20MWp)

Sector: Solar • Location: Namibia

Source: World Bank Group

Project
Active

The project comprises the development of Gerus solar PV plant , located in Outjo, Kunene Region, Namibia. The sponsor is Solarcentury Africa Limited, in partnership with Sino Energy (Pty) Limited. It has reached financial close in October 2024 for the value of $20 million (N$354 million), fully funded by Solarcentury Africa. The project will be the first fully merchant independent power producer (

Project Information FAQ

Project Information

4 Q
The project “Gerus Solar Power Plant (20MWp)” is an infrastructure initiative in the Solar sector, located in Namibia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the development of Gerus solar PV plant , located in Outjo, Kunene Region, Namibia. The sponsor is Solarcentury Africa Limited, in partnership with Sino Energy (Pty) Limited. It has reached financial close in October 2024 for the value of $20 million (N$354 million), fully funded by Solarcentury Africa. The project will be the first fully merchant independent power producer (IPP) in Southern Africa, trading all its renewable energy on the Southern African Power Pool (SAPP) without PPA agreement with the Government. It has secured a generation license from Namibia’s Electricity Control Board (ECB), connection agreements from utility NamPower, and an Environmental Clearance Certificate from Namibia’s Ministry of Environment. It also benefits from the backing of the Namibia Investment Promotion and Development Board (NIPDB). While the plant intends to sell all its power on the SAPP, it will also have the flexibility to sell power within Namibia to contestable customers, such as large mining and industrial operations, under the new Modified Single Buyer (MSB) rules. The power generated will be sold by Solarcentury Africa’s trading arm, Solarcentury Trading, a member of the SAPP. Sino Energy acted as a co-developer on the project. The new solar plant is expected to generate 51 GWh of electricity annually, offsetting approximately 8,600 tonnes of carbon dioxide emissions. Alensy Energy Solutions Pty Limited, a leading Namibian EPC contractor, has been appointed to construct the plant, creating over 150 local jobs. The facility will connect to the NamPower Gerus substation and the main North-South transmission network. It is scheduled for commissioning in the third quarter of 2025. https://solarquarter.com/2024/10/24/solarcentury-africa-and-sino-energy-reach-financial-close-on-20-mwp-solar-pv-plant-in-namibia/#google_vignette ; https://miningandenergy.com.na/solarcentury-sino-energy-reach-financial-close-on-n354m-namibia-solar-plant/ ; https://solarquarter.com/2024/10/24/solarcentury-africa-and-sino-energy-reach-financial-close-on-20-mwp-solar-pv-plant-in-namibia/#google_vignette ; https://miningandenergy.com.na/solarcentury-sino-energy-reach-financial-close-on-n354m-namibia-solar-plant/ ;

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data