Gestamp Cabeco Preto & Pedra do Reino Wind Farms
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Spanish Gestamp Renewables was granted four authorizations to build and operate wind power plants known as Cabeco Preto Wind Park with 39.6 MW and Pedra do Reino Wind Park with 39 MW for a total installed capacity of 78.6 MW in the states of Rio Grande do Norte and Bahia.
Gestamp Renewables created the following subsidiaries to manage the projects: Gestamp Eólica Baixa Verde S.A. for EOL Cab
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Government, Car parking, Wind, Raw Materials, Automotive
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Gestamp Cabeco Preto & Pedra do Reino Wind Farms
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Spanish Gestamp Renewables was granted four authorizations to build and operate wind power plants known as Cabeco Preto Wind Park with 39.6 MW and Pedra do Reino Wind Park with 39 MW for a total installed capacity of 78.6 MW in the states of Rio Grande do Norte and Bahia. Gestamp Renewables created the following subsidiaries to manage the projects: Gestamp Eólica Baixa Verde S.A. for EOL Cabeco Preto (19.8 MW); Gestamp Eolica Moxoto S.A. for EOL Cabeco Preto IV (19.8 MW); Eólica Pedra do Reino SA for EOL Pedra do Reino I (21 MW) and Gestamp Eolicatec Sobradinho S.A for EOL Pedra do Reino III (18 MW). In 2009, Gestamp Renewables won the rights to sell electricity to the grid via a tender carried out by the government. Starting in August 2010, Gestamp Renewables signed 15-year power purchase agreements with several electricity distribution companies to provide electricity to the grid. The total investment in the wind farms was estimated to be BRL 351.9 million or US$215.6 million. In October 2011, the four subsidiaries (Gestamp Eolica Baixa Verde SA, Gestamp Eolica Moxoto SA, Gestamp Eolicatec Sobradinho SA, and Eolica Pedra do Reino SA) requested loans from Sudene (northeastern region development agency) for the amount of US$ 125.2 million (BRL 210.5 million). As of November 2012, these loans had not been approved, but construction works were concluded in the first semester of 2012. In May 2012, EOL Cabeco Preto I and EOL Cabeco Preto IV commenced commercial operations, while the other two power plants commenced operations in 2013. In 2013, the the state-owned bank BNDES granted a US$ 37.5 million (BRL 88.2 million) to the project companies. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government, Car parking, Wind, Raw Materials, Automotive |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
