The Spanish Gestamp Renewables was granted four authorizations to build and operate wind power plants known as Cabeco Preto Wind Park with 39.6 MW and Pedra do Reino Wind Park with 39 MW for a total installed capacity of 78.6 MW in the states of Rio Grande do Norte and Bahia.

Gestamp Renewables created the following subsidiaries to manage the projects: Gestamp Eólica Baixa Verde S.A. for EOL Cab

Project Information FAQ

Project Information

4 Q
The project “Gestamp Cabeco Preto & Pedra do Reino Wind Farms” is an infrastructure initiative in the Wind sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Spanish Gestamp Renewables was granted four authorizations to build and operate wind power plants known as Cabeco Preto Wind Park with 39.6 MW and Pedra do Reino Wind Park with 39 MW for a total installed capacity of 78.6 MW in the states of Rio Grande do Norte and Bahia. Gestamp Renewables created the following subsidiaries to manage the projects: Gestamp Eólica Baixa Verde S.A. for EOL Cabeco Preto (19.8 MW); Gestamp Eolica Moxoto S.A. for EOL Cabeco Preto IV (19.8 MW); Eólica Pedra do Reino SA for EOL Pedra do Reino I (21 MW) and Gestamp Eolicatec Sobradinho S.A for EOL Pedra do Reino III (18 MW). In 2009, Gestamp Renewables won the rights to sell electricity to the grid via a tender carried out by the government. Starting in August 2010, Gestamp Renewables signed 15-year power purchase agreements with several electricity distribution companies to provide electricity to the grid. The total investment in the wind farms was estimated to be BRL 351.9 million or US$215.6 million. In October 2011, the four subsidiaries (Gestamp Eolica Baixa Verde SA, Gestamp Eolica Moxoto SA, Gestamp Eolicatec Sobradinho SA, and Eolica Pedra do Reino SA) requested loans from Sudene (northeastern region development agency) for the amount of US$ 125.2 million (BRL 210.5 million). As of November 2012, these loans had not been approved, but construction works were concluded in the first semester of 2012. In May 2012, EOL Cabeco Preto I and EOL Cabeco Preto IV commenced commercial operations, while the other two power plants commenced operations in 2013. In 2013, the the state-owned bank BNDES granted a US$ 37.5 million (BRL 88.2 million) to the project companies.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data