logo

Gestamp Karoo Wind Farm

Sector: Commercial • Location: South Africa

Source: World Bank Group

Project
Active

The Karoo Renewable Energy Facility was a 75 MW wind energy facility to be located in Karoo, South Africa. The project was developed by a consortium comprising of the Spanish from Gestamp Corporation (60%), through their subsidiary Gestamp Wind, and the South African investment firm the Shanduka Group (25%). Other equity holders were SARGE (the Roux familiy), the land holder and original develope

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Wind, Raw Materials, Education, Power Transmission, Government
Location
South Africa
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Gestamp Karoo Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Gestamp Karoo Wind Farm” is an infrastructure initiative in the Commercial sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Karoo Renewable Energy Facility was a 75 MW wind energy facility to be located in Karoo, South Africa. The project was developed by a consortium comprising of the Spanish from Gestamp Corporation (60%), through their subsidiary Gestamp Wind, and the South African investment firm the Shanduka Group (25%). Other equity holders were SARGE (the Roux familiy), the land holder and original developer (12.5%), and Nobelsfontein Educational Trust (2.5%). The project was awarded in a tender administered by the Department of Energy where a critical factor in the decision was the projected price of power. Contractual negotiations on the PPA and financing were to be completed by June 2012, but it was predicted that there would be a 20 year PPA with the state owned utility, Eskom. Project advisers were: Standard Bank (Financial), Wind Prospect (Wind), Dewey & Le Boeuf (Legal) and, Savannah (EIA). Wind measurements were undertaken starting in October 2010. Total project cost was estimated at ZAR 1.7 billion (USD 220 million), with comissioning expected for 2014. The project applied for UNFCCC CDM financing. Senior debt was to be provided by Standard Bank. In November 2012, the project reached financial close, with financing provided by Standard Bank. http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/Noblesfontein%20(Coria%20(PKF)%20Investments%2028)%20(Pty)%20Ltd.pdf http://www.shanduka.co.za/projects/Karoo-Renewable-Energy-facility/index.html?&re=1 http://www.bloomberg.com/news/2012-11-21/shanduka-may-boost-power-projects-to-more-than-200-megawatts.html http://renewables.seenews.com/news/gestamp-led-consortium-to-start-building-73-8-mw-s-africa-wind-farm-soon-report-318060

Original sector

Energy

Budget

Location

Country

South Africa

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Wind, Raw Materials, Education, Power Transmission, Government

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project