Gestamp Serra de Santana Wind Farm

Sector: Steel • Location: Brazil

Source: World Bank Group

Project
Active

Starting in April 2012, the Spanish company Gestamp Renewables was granted 35-year authorizations to build and operate five wind power plants known as Serra de Santana wind park in Rio Grande do Norte state. Serra de Santana Wind Park was planned with a total capacity of 125.4 MW split into five wind power plants, each managed by its own project company: Gestamp Eolica Serra de Santana S.A. (EOL S

Status
Prospective
Sector
Steel, Car parking, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Automotive, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Gestamp Serra de Santana Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Gestamp Serra de Santana Wind Farm” is an infrastructure initiative in the Steel sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Starting in April 2012, the Spanish company Gestamp Renewables was granted 35-year authorizations to build and operate five wind power plants known as Serra de Santana wind park in Rio Grande do Norte state. Serra de Santana Wind Park was planned with a total capacity of 125.4 MW split into five wind power plants, each managed by its own project company: Gestamp Eolica Serra de Santana S.A. (EOL Serra de Santana I, 19.8 MW); Gestamp Eolica Lagoa Nova S.A. (EOL Serra de Santana II, 28.8 MW); and Gestamp Eolica Serido S.A. (EOL Serra de Santana III, 28.8 MW); Gestamp Eolica Lanchinha S.A. (EOL Parque Eolico Lanchinha, 28 MW); Gestamp Eolica Paraiso S.A. (EOL Parque Eolico Pelado, 20 MW). Gestamp Renewables won the rights to sell electricity to the grid via a tenders carried out by Aneel, the electricity regulatory agency. In August 2010, three project companies signed 30-year contracts with the regulatory agency ANEEL to provide electricity to the grid at a rate of US$ 71/MWh (BRL 125/MWh). In 2011, two other signed power purchase contracts to sell electricity to distribution companies at a rate of US$ 62/MWh (BRL 101/MWh). The total investment in the five power plants was estimated at BRL 486.5 million or US$ 145.8 million. In November 2015, the state-owned bank BNDES approved a US$ 118.7 million (BRL 396 million) loan to the project. The remaining investment cost was set to be equity financed. The projects were granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, companies were allowed to use accelerated depreciation methods of accounting for construction expenditures. Finally, the electricity sold were not subject to sector taxes.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Steel, Car parking, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Automotive, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project