GGSD Chenango Lift Station Improvements
Sector: Water Supply and Storage • Location: Greenwood Village, Colorado, United States of America
Source: Dodge USA
Scope - The Project includes to Furnish and install approximately 1,100 linear feet of 4-inch PVC force main using open cut excavation, one (1) cleanout manhole with plug valve, one (1) vault with cleanout, plug valve, and combination air valve, one (1) bypass connection in existing manhole, abandon existing 4-inch CIP force main in place and remove CIP force main as necessary to install new pipe,
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Greenwood Village, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about GGSD Chenango Lift Station Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes to Furnish and install approximately 1,100 linear feet of 4-inch PVC force main using open cut excavation, one (1) cleanout manhole with plug valve, one (1) vault with cleanout, plug valve, and combination air valve, one (1) bypass connection in existing manhole, abandon existing 4-inch CIP force main in place and remove CIP force main as necessary to install new pipe, remove and replace two (2) submersible sewer pumps and mechanical piping in the wet well and met... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Greenwood Village |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
